Home Renovation Without Aggravation

Home Renovation Without Aggravation

Think this year might finally be the year to tackle that big home renovation project you’ve been putting off? Welcome to the club. Fueled largely by the rebounding housing market, home improvement spending is projected to reach $155 billion this year, surpassing the peak set in 2006, according to Harvard’s Joint Center for Housing Studies. At the same time, the construction industry is in the throes of a massive labor shortage, having shed more than 2 million jobs since 2007.

You don’t need a degree in Keynesian economics to spot the problem: Demand for home renovation work is swiftly outpacing the supply of qualified professionals. So if you want to be in your dream kitchen by the holidays, you could be clutching your tile samples a lot longer than anticipated.

Though the number of remodeling pros has declined, there are still less experienced—and less scrupulous—ones out there, according to a recent survey of 300 general contractors from around the country conducted by the Consumer Reports National Research Center. Among the shady industry practices general contractors reported are contractors using unskilled laborers to carry out their work, and winning jobs with lowball bids and then jacking up the cost later with “unforeseen problems.”

Follow our advice and you could save thousands of dollars on your renovation without compromising quality—or losing your cool.

The Planning Phase

Proper planning is the best predictor of satisfaction and will also minimize the number of costly changes you make once the work is underway. So before you even think of looking for a contractor, you’ll need to spend time gathering ideas and taking a hard look at your own budget. A 2015 report from Houzz, a home-design website, found that half of homeowners who renovated their kitchen gathered ideas for six months or longer. You can organize inspirational photos by using Houzz’s ideabook feature or starting a Pinterest page; an old-fashioned scrapbook with pictures from your favorite magazines will also work.

As excited as you might be to get started, avoid the temptation to rush: Chances are you’ll be living with the results of the home renovation project for a long time, so you’ll want to get it right. Consider factoring major life changes into your plan, which could include an accessible walk-in shower or an open-plan family room big enough to accommodate your future teenage kids and their friends.

Remember to consider the impact on the resale value of your home, too, even if you have no plans to move. For example, you might not have any use for the second bathroom with a full tub, but you’ll probably regret converting it into a home office or workout room if you ever do decide to sell, because additional bathrooms are always a big selling point.

Once you have a clear idea of what you’d like to do and how much you can realistically spend, it’s time to bring in the pros. For major home renovation projects—say, a gut kitchen renovation or family room addition—you should gather your entire team as early as possible.

If you’re not knocking down walls or making other structural changes, an interior designer or a certified kitchen and bath designer can probably draw up the plans; most charge fees between 4 and 7 percent of the total budget—compared with the 10 to 20 percent most architects charge.

Though word-of-mouth referrals from friends and neighbors are the best way to find remodeling pros, real estate agents can also provide leads to reputable general contractors. The National Association of the Remodeling Industry offers a state-by-state directory of certified contractors on its website, nari.org (its members must go through extensive screening and testing and adhere to a strict code of ethics), and online home services, such as Angie’s List, HomeAdvisor, and Porch, can also help you find pros. Remember these rules as you go through the vetting process:

Check credentials. Even if they come with a glowing review from your sister-in-law, you still need to check the bona fides of every professional on your short list. Though proper credentials aren’t a guarantee of quality, they’re a good sign that the general contractor runs a reputable business.

Listen to your gut. Trust and a good rapport between you and your contractor are essential. Any negative feelings you have during the initial interview (Too bossy? Condescending? Rushed?) will only intensify as the home renovation project heats up. It’s also important to understand how a general contractor communicates during a project and to be comfortable with that method. Ask whether you’ll be dealing with him directly, or whether he’ll be delegating the job to one of his project managers (if the latter, make sure to vet the manager, too). Beyond face time, some general contractors rely on email or handwritten notes, and others use construction management software, which lets a homeowner track scheduling, payments, shipments, and more.

Remember that budgets are a moving target. The number you start out with during the planning phase is likely to change when you begin to see what materials actually cost. General contractors have to make similar calculations, factoring what they think the job will cost against their own profit margins and unforeseen expenses.

Always negotiate. Only 4 percent of general contractors say they are never willing to negotiate the price of a job (66 percent are somewhat willing, and 30 percent are very willing). Getting bids from at least three general contractors will give you a sense of the market rate and also provide bargaining power. “Remember, the lowest bid may not be the best,” says Katherine Hutt, national spokeswoman for the Better Business Bureau. Conventional wisdom holds that you should throw out the highest bid, but if you think that the general contractor offering it is the best person for the job, it’s worth trying to negotiate a lower price.

Keeping the business of a repeat customer was the biggest reason to haggle, cited by 75 percent of general contractors, who reported offering a median discount of 10 percent. So if there’s more work coming down the line, be sure to mention that during negotiations. Combining projects could also save you in the long run: Two-thirds of general contractors say they offer discounts on jobs involving more than one room (10 percent is the median discount offered on multi­room projects).

Be prepared for surprises. Even though most contractors plan for contingencies, we recommend adding at least a 10 percent cushion into your budget to cover such surprises.

On major home renovation projects, it’s worth paying a few hundred dollars for a pre-inspection by a certified home inspector. “Even a good general contractor might only look as far as the kitchen or bathroom; we see the house as a system,” says Frank Lesh, executive director of the American Society of Home Inspectors. “Let’s say you’re putting in an extra bathroom. We’ll come in with sewer scopes to make sure the plumbing system can handle the extra stress.”

Larger contracting companies might offer a pre-inspection as part of their overall service. “We have a building performance engineer on our team who specializes in exploratory work,” says John Kraemer, a general contractor based in Edina, Minn. “Using an infrared camera, he might find missing floor joists or walls that don’t have any insulation.” You’ll still have to deal with the problems, but not in the last-minute manner that can quickly blow the budget.

Get everything in writing. No matter how much faith you have in your general contractor, a written contract is an essential protection for both of you. It should specify the full scope of the work, including a detailed breakdown of labor and material costs for each part of the project. For example, the electrical costs shouldn’t be a single dollar amount. The contract should list the number of outlets, switches, and light fixtures, including all model numbers. It should also state a start and completion date (ask for a penalty fee of, say, $50 to $100 for every day past the deadline) and include a payment schedule, such as a 5 percent initial deposit with the remainder paid at defined milestones, for example, demolition, rough framing, and installation of finish materials.

Be sure the contract also spells out “exclusions,” or what’s not included. For major home renovation projects, it’s also worth including an arbitration clause. Should a major dispute arise between you and your general contractor that can’t be settled in good faith, the clause provides language for resolution outside the court system, often with a state-appointed mediator. As for the fine print, watch out for “allowances,” which give the contractor a lot of leeway in the prices of products and materials, and can end up busting the budget very quickly.

The Work Phase

No matter how well you plan, remodeling is full of uncertainty. We always tell our clients to bump up their estimates of time and money by 20 percent. Kitchen projects require a median of three weeks to complete, but a third of them take four weeks or longer.

The work is messy, too. If there’s any way for you to move in with relatives or into a hotel, at least during the dusty demo phase, you’ll minimize stress—along with possible exposure to hazardous materials. If your home was built before 1978, your general contractor will need to follow the Environmental Protection Agency’s Lead Renovation, Repair and Painting Rule, which includes containing lead dust with plastic sheeting and disposing of contaminated debris in heavy-duty bags.

Store valuable or treasured items far from the work site or at a storage facility. If you have to stay in the house, a good contractor will help you find ways to keep disruptions to a minimum, by setting up a temporary food-prep space and relocating the refrigerator, for instance, during a kitchen renovation. These other tips will save you trouble once the work begins:

Stay involved. You can’t just write the contractor a check—then check out. Homeowner involvement throughout the project is critical. Even if you’ve moved out of the house, plan on a couple of in-person meetings every week and more frequent meetings at crucial points, such as during the demolition phase or before tile is installed (changing the layout or grout color can be difficult and costly once work has started).

Stick to the plan. Changing your mind after the work is underway is the biggest mistake homeowners make, and it can be the costliest too. So-called change orders, or work that arises after the contract has been signed, inflate the budget by an average of 10 percent. It might be as simple as adding another couple of light fixtures in the hall, but that means the general contractor has to get the electrician back in, and probably the painter, too. The domino effect quickly adds up, and the homeowner foots the bill.

Make the general contractor your point person. Engaging the subcontractors directly often creates conflict. If you have a question about their work—or their behavior—tell the general contractor and let him or her handle it.

Though you shouldn’t engage the subcontractors, you do need to be sure they’re being paid. If they’re not, you could be held liable. Stipulate in the contract that the general contractor will provide you with lien releases (basically proofs of payment) signed by the general contractor and subcontractor throughout the project.

 

The Post-Project Phase

There’s no such thing as perfection on a remodeling job. That said, don’t make the final payment until you’re 100 percent satisfied with the project. Making sure the electrical plates are dead-square on the walls is worth being picky about. Otherwise they will haunt you.

Share your experience. Word-of-mouth still rules, but the power of online reviews on sites such as HomeAdvisor and Porch is getting stronger. Whether you had a great experience or a terrible one, you’ll be providing a valuable service to other homeowners (and threatening to share a negative experience might also bring a wayward contractor back in line).

If you follow our guidelines, though, chances are your remodel will turn out just the way you wanted. Then it’s time to start dreaming about your next project.

LEAVE A COMMENT

You comment will be published within 24 hours.

Cancel reply

4 COMMENTS

  • Debora Hilton
    June 12, 2015, 12:29 pm REPLY

    My wife and I renewed our kitchen in early 2015. We got 95% of what we wanted from a kitchen-and-bath specialist for a total cost of $33 thousand. We could have saved at least $2 thousand and some grief if we had done two things better: First, have detailed conversations with more contractor candidates, and start planning earlier. You learn a lot by asking questions of potential contractors. We used Angie’s List to solicit proposals from 21 contractors, had seven visit our home, and planned showroom visits with six of the seven. That was fine but we got antsy and stopped the search after visiting the third contractor. In retrospect, we wish we had visited all six showrooms. Second, if you are using a fixed-price contractor, make sure the contract specifies EVERY significant item, and leave nothing to be decided. Design-build firms and architects give you more flexibility, but they can double your cost.

  • Katie Evans
    June 12, 2015, 12:30 pm REPLY

    You cannot over plan. I think 18+ months of planning is the right amount.
    Specify everything. Down to the drywall screws.
    Based upon my experience doing a whole house renovation. Which went very smoothly.

  • Adrienne
    May 26, 2017, 9:06 pm REPLY

    Great advice you gave your clients: avoid the temptation to rush through the design phase even though you are so eager to get to the finished results. We give our clients in Texas a lot of the same advice you are giving here in this article. It is so important for homeowners to stay involved throughout the entire project-you are so right! We want our clients to be as happy as possible, and that means tackling the project as a team rather than writing a check to the contractor and wearing a blindfold until the project is finished. That only ends up with disappointment and stress.

  • Amber Cook
    August 4, 2017, 12:40 pm REPLY

    Basically there is a chance of aggravation in any kind of renovation project, and if it is the case of home improvement, then there exists near about 90% chance of provocation. This occurs mainly due to poor planing. Thus, we need to work out efficiently on our planning section. Apart from this, as we need the help of a professional in this case, hence before going to hire any contractor, first we should scrutinize the testimonials including( id, license, warranty, certificate) by which we can make sure that our dream project is in the safe hand. Well, these steps may not eliminate the chance of inconvenience completely, but it will reduce it to a significant level.

COST OF RENOVATION

Use our form to request an estimate for the initial cost of remodeling, renovation or installation

Or call us at (559) 299-7613

REQUEST AN ESTIMATE

Service Areas

Serving clients in Fresno, Clovis and within 65 miles of 5935 East Clinton Avenue Fresno, CA 93727-8642

Houzz

FREE In-Home Design Consultation

Collaborate with our talented team within the comfort of your home.

LEARN MORE
Latest Posts
Most Viewed

Our Services

With over 30 years experience and a real focus on customer satisfaction, you can rely on us for your next interior or exterior home renovation, patio installation and more. We provide professional service and few boundaries! View Our Services

© Copyright 2017 RFMC Inc
 
error: Content is protected !!